Artist concept of a SpaceX Starship lunar lander on the surface of the moon. Image: SpaceX. New NASA Administrator Jared Isaacman announced a major overhaul of the agency’s Artemis moon
Artist concept of a SpaceX Starship lunar lander on the surface of the moon. Image: SpaceX. New NASA Administrator Jared Isaacman announced a major overhaul of the agency’s Artemis moon
NASA’s crawler-transporter 2, carrying NASA’s Artemis 2 SLS (Space Launch System) rocket with the Orion spacecraft secured to mobile launcher 1, rolls back Wednesday, Feb. 25, 2026, to the Vehicle
A closeup view shows the NASA’s Artemis 2 SLS (Space Launch System) rocket with the Orion spacecraft and launch abort system atop at Launch Complex 39B at NASA’s Kennedy Space
The countdown clock at the Kennedy Space Center Press Site stops at T-29 seconds at the end of the second terminal countdown demonstration, bringing an end to the wet dress
NASA’s Space Launch System rocket is seen at Launch Complex 39B in the midst of pre-launch testing for the Artemis 2 mission. Image: Michael Cain/Spaceflight Now NASA will try again
Base of the Space Launch System (SLS) rocket where the tail service masts feed propellants into the rocket’s core stage. Image: Michael Cain/Spaceflight Now. NASA is loading liquid hydrogen aboard
The four crew members of the Artemis 2 mission exit the Neil Armstrong Operations and Checkout Building during the Countdown Demonstration Test, a launch day rehearsal for the Artemis 2
Axiom Space’s Axiom Extravehicular Mobility Unit (AxEMU) spacesuit features a visor system provided through a partnership with Oakley. Image: Axiom Space The next humans to walk on the South Pole
The Mary W. Jackson NASA Headquarters in Washington D.C. Image: NASA The White House released its proposed federal spending budget for Fiscal Year 2026 on Friday and with it a






